![]() |
|
||||||||||||||||
|
|
||||||||||||||||
|
8:00 - 8:45 a.m. |
|||||||||||||||||
| 1 |
Maintaining Our Bridges
|
Better Cost Estimates & Bridge Deck Quantities
with Ground Penetrating Radar Robert Taylor Extending the
Service Life of Bridges – Another Milestone |
|||||||||||||||
| 2 | Alternative Overlay and Joint Materials for Bridge Decks |
Alternative Overlay and Joint Materials for
Bridge Decks Doug Zuberer |
|||||||||||||||
| 3 |
Chip Seal Best Practices, Part 1
|
Chip Seal Best Practices |
|||||||||||||||
| 4 |
How to Build a 700 Foot, $20 Million Bridge in
|
Construction Contract Administration Douglas Raby Design Considerations James Barker |
|||||||||||||||
| 5 | Using Prestressed Concrete Piling |
Using Prestressed Concrete Piling |
|||||||||||||||
| 6 |
Interstates -The Next 50 Years Facing Funding,
Increased Congestion, Maintenance, and Technology Challenges |
Setting Priorities for the Future (8:00-8:25
am) Scott Phinney Using Technology to Make Good Decisions (8:25-8:45 am) Michelle May |
|||||||||||||||
| 10:30 - 11:30 a.m. (back to top) | |||||||||||||||||
| 7 | Bridge Design |
Design and Construction of the Clifford Hollow
Bridge Ken Wright Post Tension Design of Straddle and Hammerhead Bent Caps for FRA-161 Panchy Armugasaamy |
|||||||||||||||
| 8 | Local Issues – Storm-Water Management and Asset Management |
Storm-Water-Requirements and Implementation
Strategies Sarah Hippensteel
Asset Management-Keeping Ahead of the
Deterioration Curve-+ |
|||||||||||||||
| 9 | Regional and National ITS Highlights |
ITS Performance Measures for the Columbus
Metropolitan Freeway Management System Christopher Hedden Vehicle Infrastructure Initiative (VII) - Michigan DOT Activities Greg Krueger |
|||||||||||||||
| 10 | Chip Seal Best Practices, Part 2 |
Chip Seal Best Practices Dr. Douglas Gransberg |
|||||||||||||||
| 11 |
Integrating Neighborhoods into Major
Urban Corridors |
Lakefront West – and Returning the Lakefront
to the Neighborhood Debbie Berry What Does the Future
Hold for I-75? |
|||||||||||||||
| 12 | Innovative Design Build 200’ Single Span Bridge Post-Tensioned |
Local-let Projects: What’s New Linda Bailiff Design Build Bridge Replacement Brian Slagel |
|||||||||||||||
| 13 | IMSE Wall Issues |
Durability of Galvanized Soil Reinforcement:
Building on 32 Years of MSE Experience Robert Gladstone ODOT Design and Construction Requirements for MSE Walls Peter Narsavage |
|||||||||||||||
| 14 |
The Prediction of Coarse Aggregate Performance
by Micro-Deval and Other Soundness, Strength, and Intrinsic Particle
Property Tests |
The Prediction of Coarse Aggregate Performance
by Micro-Deval and Other Soundness, Strength and Intrinsic Particle
Property Tests John Allen |
|||||||||||||||
| 15 |
Concreting into the Future |
Evaluation of High Absorptive Materials to
Improve: Internal Curing of Low Permeability Concrete Norbert Delattepart 1 | part2 Status of Ultra High Performance Concrete (UHPC) Eric Steinberg
Using the Internet to Control Concrete Quality |
|||||||||||||||
| 1:00 - 2:30 p.m. (back to top) | |||||||||||||||||
| 16 |
Slope Stability Issues |
How Geologic History Affects the Geotechnical
Performance of Transportation Projects in Downtown Cleveland Donald Wotring Landslides Induced by Rapid Drawdown at Belleville Dam Chris Merklin
Investigation and Remediation of an Unstable
Slope on WAS-7-18.10 in Marietta |
|||||||||||||||
| 17 |
Bridges |
Millau Viaduct, Design and Construction Michel Moussard State of Ohio Bridges Tim Keller |
|||||||||||||||
| 18 |
Consultant Inspection Involvement on ODOT
Construction Projects |
Planning ODOT Construction Project Staffing Gary Middleton | Lyle Flower QCI Has
Performed Construction Project Engineering, Contract Administration and
Construction Inspection Services for Numerous Municipalities Throughout
the State of Ohio. |
|||||||||||||||
| 19 |
Wetland and Stream Mitigation for Project
Management |
Wetlands Mitigation to Meet Today’s Rigorous
Standards Karen Wise Bridging the Gap Between
Design and Construction of a Comprehensive Stream Mitigation Project in
Pennsylvania |
|||||||||||||||
| 20 | Survival Skills for Future Engineers and Transportation Professionals: Things You Don’t Always Learn in College |
Survival Skills for Future Engineers and
Transportation Professionals: Things You Don’t Always Learn in College Mike Fitch Q&A Session with a Panel of Transportation Professionals Michael Meeks | Matthew Lawler |
|||||||||||||||
| 21 |
Lessons Learned Managing Ohio’s Mega Projects |
I-70/71 Split Project: Downtown Columbus |
|||||||||||||||
| 22 |
Ramp Metering in Ohio |
Ramp Metering in Ohio James Young | Marian Thompson
Traffic Management Using Ramp Metering: Best
Practices Ramp Metering in Phase 1 of the Columbus
Metropolitan Freeway Management System |
|||||||||||||||
| 23 |
Using Pavement Condition Data to Make Local
Government Decisions |
Opening a Crack for Pavement at Local
Government level: Making Pavement Management Systems Relevant Bill Barlow
Pavement Condition Ratings: Eliminate the
Politics
NOACA Regional Pavement Management System |
|||||||||||||||
| 24 | From the Interstates to the Internet: Traveling the Information Super Highway |
From Interstate to Internet: Increasing the
Speed of Ideas George Needham
Transportation Information On-Demand: TKNs &
The Transportation Library Connectivity Pooled Fund Study |
|||||||||||||||
| 3:00 - 5:00 p.m. (back to top) | |||||||||||||||||
| 25 |
Form & Function: The Growing Link Between
Transportation and Urban Design |
Form & Function: The Growing Link Between
Transportation and Urban Design |
|||||||||||||||
| 26 |
The History of the Interstate System & Urban
Development |
The National Defense Highway System
A History of Freeways in Northeast Ohio |
|||||||||||||||
| 27 | Facilitating Teamwork |
Creating More Team Mojo |
|||||||||||||||
| 28 |
Integrating Environmental Stewardship with
Transportation Infrastructure |
Stormwater Best Management Practices for
Roadway Improvements Ted Blahnik Employing Interchange Infields as Storm Water Management Tools Michael Rekstis Innovative Job Status Monitoring Techniques Using GIS: ODOT’s MS4 Outfall Inventory Nicole Clune |
|||||||||||||||
| 29 | Asphalt Pavements- Concepts for Sustainable Highways |
ODOT Looks at Warm Mix Asphalt |
|||||||||||||||
| 30 |
LRFD Bridge Design Specifications |
ODOT Implementation of LRFD Bridge Design
Specifications Jawdat Siddiqi Bridge Design Manual Updates for the LRFD Specifications Sean Meddles ODOT Benchmarking with the LRFD Specifications Teddy Antonios |
|||||||||||||||
| 31 | Making Interstate Work Zones Safer |
Providing Traveler Information in the I-75
construction Zone in District 7 |
|||||||||||||||
| 32 | Innovation in Pipelines |
TNeese Creek Culvert Dr. Teruhisa Masada Stress Reduction by Using Geofoam for High Fill Culverts Tommy Hopkins | Charlie Sun
State of the Art in Trenchless Technology |
|||||||||||||||
| 33 | Marquette Interchange – Building the Future Interstate |
Marquette Interchange – Mega Project: Owner’s
Perspective David Nguyen B. Marquette Interchange – Project Overview and the Structures Involved Tony Shkurti
Marquette Interchange – Subsurface
Investigation and Design Phase Load Test Program |
|||||||||||||||